Find your first automation in an afternoon. Bring a pen, not a vendor.

A step-by-step method for finding, costing and choosing the first process worth automating, using nothing more than a few colleagues and a spreadsheet.

You do not need a strategy programme to find your first automation. You need three or four people who do the work, a little over two hours, and a willingness to hear how much of the week goes on copying things from one place to another. This is the method we use in a discovery call, written out in full so you can run it yourself.

What you are looking for

A good first automation is boring. It is not the most important process in the business. It is one that happens often, follows rules, and annoys people. Specifically:

  • It happens at least weekly, ideally daily.
  • The rules could be explained to a temp on their first morning.
  • The inputs arrive digitally: emails, forms, files, records in a system.
  • A mistake can be spotted and fixed. Nothing irreversible happens without a human looking.
  • Somebody would genuinely like it gone.

Step one: the inventory (about 45 minutes)

Get three to five people who do the day-to-day work in a room or on a call. Not their managers, or not only. Ask them to walk through last week, day by day, and list every task that involves copying, re-keying, chasing, reformatting, checking or searching.

Useful prompts: what do you do every Monday that you resent by Tuesday? What would you hand to an assistant first? What happens when a new client, order or case comes in, step by step? Where do you go looking for things?

Write everything down, however small. Note any task where the answer to 'how does that work' is a person's name. That is knowledge living in one head, and it matters later.

Step two: put a number on each (about 30 minutes)

For each task, estimate four things: how often it happens a week, how many minutes it takes each time, how many people do it, and a rough hourly cost for those people including overheads. Multiply them. Guesses are fine, as long as you write down that they are guesses.

A worked example. Say four people each spend five hours a week re-keying order details from emails into the order system. That is twenty hours a week. At an assumed £25 an hour fully loaded, it is £500 a week, or about £24,000 over a 48-week working year. The number does not need to be precise. It needs to be in the right order of magnitude, so you can compare tasks honestly.

You will usually find two or three tasks with numbers that are faintly embarrassing. Good. Those are the candidates.

Step three: score and cut (about 30 minutes)

Take the top five by cost and score each from one to three on the following. Be harsh.

  1. Volume: does it happen often enough that saving a few minutes each time adds up?
  2. Clarity: are the rules written down, or could they be in an hour? If every case is a judgement call, park it.
  3. Access: is the information in systems that can be connected to, or in PDFs, phone calls and someone's memory?
  4. Risk: if it goes wrong, is that an awkward email or a regulatory problem?
  5. Ownership: is there a named person who will check it works and say when it does not?

Cross out anything that needs a system replaced before it can be automated. That is a different project. The highest total that survives is your first automation.

Step four: write a one-page brief (about 30 minutes)

Before anyone builds anything, write down on a single page:

  • What triggers it: an email arrives, a form is submitted, a status changes.
  • What it needs: the inputs, and where each one comes from.
  • What it decides, and which rules it follows.
  • What it produces, and where that output lands. It should land in a tool people already use.
  • Who checks it, and how often, at least for the first month.
  • The baseline: the hours and pounds from step two, so you can measure afterwards.
  • What failure looks like, and when you would stop.

That page is now more useful than most strategy documents. It is specific enough to build, specific enough to measure and short enough that people will read it.

Then build that one thing, measure it against the baseline after a few weeks, and decide. If it paid, go back to your list for the next one. If it did not, stop and work out why before spending anything else. You will have learnt more about your own operations in an afternoon than a lot of businesses learn in a year of talking about AI.

All articles